My Beloved was leaving as I was coming home from work tonight. After I took a bit of rest from riding my bicycle home in 102 degree heat and getting some simple food, I sewed all evening. The baby quilt I posted about a couple weeks back is a priority as well as getting 100 more nine squares stitched. I have a baby shower that I must go to the beginning of September for my first grandbaby. For some reason, I thought I would have more time.
All the strips ae done for the last baby quilt. I have to put the top together which means ten more seams. Then the quilting. I have 30 nine squares done for the next quilt. Then there will only be two more baby quilts to make. There are always nine squares to make.